Pilot plant testwork builds Northern Minerals’ confidence in Browns Range
JOHANNESBURG (miningweekly.com) – ASX-listed Northern Minerals said on Thursday that the pilot scale testwork at its Browns Range project, in the Northern Territory, had delivered “excellent” recovery of heavy rare earths oxide (HREO) and that it had confirmed two simple and robust flowsheet options.
Testwork, in conjunction with earlier bench testing, had confirmed up to 90% improved HREO recoveries, and reinforced the processing advantages of the Browns Range xenotime mineralisation, the company stated.
The pilot plant testwork was completed in January, using a 90 t bulk sample collected from the Wolverine and Gambit West deposits. The testing was undertaken at the SGS Lakefield Oretest facility, in Perth, on the two preferred flowsheet options: magnetic separation followed by cleaner flotation circuit and the whole ore flotation circuit.
“The outcomes from the pilot plant testing have exceeded our expectations and built even more confidence in the Browns Range project. These results, and the significant increase in our Joint Ore Reserves Committee-compliant resource estimate announced earlier this week, are very positive steps forward, which we expect will have a direct and positive impact on the economics and life of our proposed mining operation.”
“The pilot plant has proven both flowsheet options are robust and are suitable to be scaled up to a commercial operation. Final selection of the beneficiation flowsheet will be done in conjunction with cost and operating data from the Browns Range prefeasibility study (PFS),” said MD George Bauk.
Data from the pilot plant testwork would be modelled within the Browns Range PFS, which is due for completion by mid-2014. The mineral concentrate from the pilot run would now be used for hydrometallurgical pilot plant testing at the Australian Nuclear Science and Technology Organisation, or ANTSO, which is due to start in March.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation