Piedmont taps Tennessee for new lithium hydroxide plant
PERTH (miningweekly.com) – Dual-listed lithium miner Piedmont Lithium has selected a site in Tennessee for the development of a new lithium hydroxide project, targeted to be the largest of its kind in the US.
The 30 000 t/y lithium hydroxide operation is expected to start production in 2025, and will convert spodumene concentrate sourced from Piedmont’s global project into lithium hydroxide to supply the US electric vehicle (EV) manufacturing industry.
Piedmont said on Friday that the Tennessee lithium hydroxide plant would complement the company’s planned Carolina lithium operation, and would bring its US-based production capacity to 60 000 t/y by 2026.
This would be a significant increase on the total lithium hydroxide capacity of 15 000 t/y currently within the US.
“The rapid electrification of the automotive market has led to massive investment in electric vehicle and lithium-ion battery production in the US, creating a critical need for lithium hydroxide produced in the US,” said Piedmont president and CEO Keith Phillips.
“Our Tennessee lithium operations should play an important role in helping to mitigate supply shortages in the American EV industry and battery supply chain, particularly in the wake of recent legislation incentivizing the use of domestically sourced critical materials and providing tax credits for US producers.”
Phillips said that the Tennessee site was selected based on the cooperative government relations, access to infrastructure, including rail, road and river transportation, a capable workforce, and a constructive business environment, as well as its proximity to the battery and automotive plants being constructed by prospective customers.
Front-end engineering design for the Tennessee lithium project is expected to conclude in the first half of 2023, and will include a definitive feasibility study, targeted for completion by the end of 2022.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation