Permitting clock starts ticking at Anaconda’s Goldboro project
TSX-listed gold miner and explorer Anaconda has filed the registration document for its Goldboro project with the Nova Scotia Department of Environment, marking the start of the permitting process and getting the company one step closer to its aim of reaching the preproduction stage in 2020.
The registration document will be available for public viewing and comment for 30 days, the company said on Tuesday.
The Goldboro project forms a strategic part of Anaconda’s strategy for near-term growth. Located about 185 km northeast of Halifax, the project has been through a preliminary economic assessment, which provided a base case for its development.
Using a gold price of $1 500/oz, the Goldboro project has a pretax net present value, at a 7% discount rate, of $189-million and an internal rate of return of 38%, implying a pretax payback period of 2.9 years.
The study is based an 8.8 year mine life, with 2.4-million tonnes of potential mill feed at an average grade of 5.13 g/t gold and a recovery rate of 93.6%, resulting in production of 375 900 oz. The mine will deliver an average of 41 770 oz/y of gold.
A potential 200 jobs can be created at the peak of production.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation