https://www.miningweekly.com

Permitting clock starts ticking at Anaconda’s Goldboro project

7th August 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

TSX-listed gold miner and explorer Anaconda has filed the registration document for its Goldboro project with the Nova Scotia Department of Environment, marking the start of the permitting process and getting the company one step closer to its aim of reaching the preproduction stage in 2020.

The registration document will be available for public viewing and comment for 30 days, the company said on Tuesday.

The Goldboro project forms a strategic part of Anaconda’s strategy for near-term growth. Located about 185 km northeast of Halifax, the project has been through a preliminary economic assessment, which provided a base case for its development.

Using a gold price of $1 500/oz, the Goldboro project has a pretax net present value, at a 7% discount rate, of $189-million and an internal rate of return of 38%, implying a pretax payback period of 2.9 years.

The study is based an 8.8 year mine life, with 2.4-million tonnes of potential mill feed at an average grade of 5.13 g/t gold and a recovery rate of 93.6%, resulting in production of 375 900 oz. The mine will deliver an average of 41 770 oz/y of gold.

A potential 200 jobs can be created at the peak of production.

Edited by Creamer Media Reporter

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.167 0.205s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: