https://www.miningweekly.com
Gold|PROJECT|Resources|Underground|Maintenance
Gold|PROJECT|Resources|Underground|Maintenance
gold|project|resources|underground|maintenance

Paulsens gold mine restart, Australia

Image of gold pour

Photo by ©Creamer Media

16th February 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Paulsens gold mine restart.

Location
Ashburton basin, in the eastern Pilbara region, Australia.

Project Owner/s
Black Cat Syndicate.

Project Description
Paulsens was placed on care and maintenance in 2017 and acquired by Black Cat in 2022. The project has resources of 406 000 oz, which will deliver 163 000 oz of recovered gold over a 4.2-year mine life.

Production will be predominantly sourced from the Paulsens underground mine (156 000 oz), with additional feed from the Belvedere underground deposit (20 000 oz).

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
A$60-million funding package is in place.

Planned Start/End Date
First gold is expected in the second half of 2024.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Black Cat Syndicate, tel +61 458 007 713 or email admin@bc8.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.114 0.164s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: