https://www.miningweekly.com
Aluminium|Conveyors|Crushing|Excavator|Iron Ore|Logistics|Mining|PROJECT|Resources|Screening|Screens|Products|Operations
Aluminium|Conveyors|Crushing|Excavator|Iron Ore|Logistics|Mining|PROJECT|Resources|Screening|Screens|Products|Operations
aluminium|conveyors|crushing|excavator|iron-ore|logistics|mining|project|resources|screening|screens|products|operations

Paulsens East iron-ore project, Australia

7th February 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Paulsens East iron-ore project.

Location
The project is located in the Pilbara, in Western Australia.

Project Owner/s
Strike Resources.

Project Description
A scoping study has confirmed excellent project economics for the Paulsens East project.

The project consists of a 3-km-long outcropping, high-grade hematite iron-ore ridge, located about 233 km south-east of the Port of Onslow, containing a Joint Ore Reserves Committee- (Jorc-) compliant indicated mineral resource of 9.6-million tonnes at 61.1% iron, 6% silicon dioxide, 3.6% aluminium oxide and 0.08% P3.

The scoping study proposes that the deposit be mined using opencut methods through drill-and-blast, excavator and truck operations.

The study estimates a production rate of 1.5-million tonnes a year of iron-ore over a four-year mine life. The bulk of the product will be high-grade 61% lump direct shipping ore, which attracts premium pricing.

The crushing and screening plant will comprise a simple jaw crusher, a cone crusher, double-deck vibratory screens, connecting conveyors and a telescopic stacking conveyor to convey the products to truck loading stockpiles.

The jaw crusher will be fed by a front-end loader from the run-of-mine pad.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The scoping study forecasts a pretax net present value, at an 8% discount rate, of between A$81-million and A$238-million (base case A$155-million), and an internal rate of return of between 263% and 649% (base case 449%). The payback period is estimated at between four months and one month (base case two months).

Capital Expenditure
Preproduction capital costs are estimated at $12-million.

Planned Start/End Date
Strike is targeting an accelerated development timetable for production to start in the third quarter of 2020.

Latest Developments
Strike has moved the project to feasibility study.

Key Contracts and Suppliers
Sanker Madan (consultant – geology, mining and processing, licensing and approvals); Wayne Richards (consultant – logistics and marketing); Phillip Jones (consultant – Jorc mineral resource); ALS Metallurgy Iron Ore Technical Centre (metallurgical testwork); and Mining Focus Consultants (mine planning).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Strike Resources, tel +61 8 9214 9700 or email info@strikeresources.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

 

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.118 0.178s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: