Pan African’s Evander on schedule for mid-April restart
Pan African Resources last week reported that the refurbishment of the 7 and 8 Shaft complex at its Evander mines was progressing on time and within the R40-million budget.
The company, led by CEO Cobus Loots, expected the refurbishment programme to have been completed on April 15.
The programme entailed the replacement of the 7 Shaft pump columns support infrastructure; the replacement of a damaged section of the main pump column at the 7 Shaft; the replacement of the water reticulation system between the 7 and 8 shafts; the removal of redundant shaft steelwork at the 7A and 8 shafts; and repairs to the 7 and 7A shaft bottoms.
The programme also includes an assessment of all other underground infrastructure that is critical to maintaining and sustaining production.
Evander Mines’ 7A Shaft, which is used for rock hoisting, has normalised hoisting speed to 13 m/s, after this was reduced to 8 m/s for repairs.
During the refurbishment period, on-mine management also focused on the preparation of Evander Mines’ underground mining areas for mining restart.
Underground mining operations Evander will restart with the hoisting of about 6 000 t of mined ore currently stored in the underground infrastructure. The processing of these tonnes will assist in the expeditious ramp-up of its underground production profile.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation