https://www.miningweekly.com

Pan African Resources expecting lower full-year earnings

29th August 2014

By: Leandi Kolver

Creamer Media Deputy Editor

  

Font size: - +

JOHANNESBURG (miningweekly.com) – JSE- and Aim-listed Pan African Resources on Friday advised that it expected its earnings per share (EPS) for the financial year ended June 30 to be more than 20% lower than that of the prior corresponding period.

The gold miner pointed out that its 2013 EPS had included an exceptional gain relating to the acquisition of Evander Mines from Harmony Gold, as well as impairment charges on the disposal related to Phoenix Platinum and Auroch Minerals.

The net effect of these transactions were increased earnings of R71.9-million, or 4.44c a share.

For the 2014 financial year, EPS were expected to be between 26% and 31% lower than the 34.51c recorded in the prior year, while headline earnings per share (HEPS) were expected to be between 16% and 21% lower than the 30.07c reported for the 2013 financial year.

Pan African noted that the 1.7% decrease in the average gold price to R433 433/kg had contributed to the decline in HEPS.

Meanwhile, the company pointed out that the low-grade mining cycle at Evander Mines was expected to continue until February next year, and would, therefore, also impact on group results and earnings for the first six months of the 2015 financial year.

Pan African was implementing measures to mitigate the impact of the current and future low-grade cycles at Evander Mines. This included the construction of the Evander tailing retreatment plant, which was expected to be completed in January, as well as increasing the surface sources throughput at the Evander plant from 18 000 t/m to 30 000 t/m.

Further, vamping at the Evander No 7 shaft had been expanded to include the 15 level return airway mud accumulation project and would add additional ounces, while management was also concentrating efforts to increase the availability of conveyor belts in the Evander No 8 shaft declines.

Management had also rescheduled mine planning and improved mining flexibility by increasing development rates on the 25 and 25A levels at Evander No 8 shaft to access more stoping areas, and was also investigating long-term mining flexibility improvements that could potentially be achieved by extending the decline system down to 26 level.

This would increase the Evander mine life from 14 to 17 years. 

Pan African would release its results on September 16.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

SABAT Batteries is a renowned brand in the battery industry, manufacturing a wide range of batteries at its state-of-the-art production facility in Gqeberha.
SABAT Batteries

SABAT Batteries is a renowned brand in the battery industry, manufacturing a wide range of batteries at its state-of-the-art production facility in...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (21/08/2026)
21st August 2026 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.046 0.068s - 128pq - 2rq
Subscribe Now