https://www.miningweekly.com

Paladin waiting for price rebound to reopen Malawi uranium mine

Paladin waiting for price rebound to reopen Malawi uranium mine

Photo by Bloomberg

4th September 2014

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Uranium miner Paladin Energy would spend some A$16-million a year on its Kayelekera mine, in Malawi, to ensure that the operation was ready to resume production once the uranium price rebounded.

Speaking to Mining Weekly Online on the sidelines of Paydirt’s Africa Downunder conference, in Perth, Paladin MD John Borshoff said that uranium prices would need to be between $65/lb and $70/lb to validate the restart of Kayelekera.

Paladin officially ceased uranium production at Kayelekera in May this year, placing the mine on care and maintenance. Mining operations had been suspended since February, but ore processing had continued.

With the mine ceasing operations, global uranium supply was reduced by around 3.3-million pounds a year.

“Putting Kayelekera on care and maintenance does not mean that we have put the project to sleep permanently, but we are waiting for it to awaken. The project has a very real potential to start again, and the medicine it needs to restart is a positive uranium outlook,” Borshoff said.

He told Mining Weekly Online that based on current market analysis, the target uranium price would likely be reached within the next 12 to 24 months.

“When you look at the production curve, we think that price will come very quickly, and it won’t be a gradual thing because it will be based on the security of supply and the fear that that inspires in users, which will cause a stampede for product.”

In the meantime, Paladin would work to increase the resource base at Kayelekera, with the miner spending A$1.5-million a year over 2015 and 2016 on exploration.

“We aim to get the project past a ten-year mine life, up from the current six years,” Borshoff said.

“By our reckoning we need two or three good field seasons to get the necessary resource, and we will start getting into the first season shortly.”

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.195 0.234s - 89pq - 3rq
1:
1: United States
Subscribe Now
2: United States
2: