https://www.miningweekly.com

Ongoing exploration to further boost Atalaya copper output

17th January 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Dual-listed Atalaya Mining produced 26 179 t of copper in 2016, in line with its guidance, boosted by average copper recoveries of 83.29% at its 100%-owned Proyecto Riotinto mine in Andalucía, Spain.

The miner on Tuesday reported that it had produced 8 938 t of copper in the last quarter of the year, compared with the 8 752 t produced in the previous quarter.

Total ore extraction during 2016 amounted to 6.8-million tonnes, with fourth-quarter ore extraction slightly above that of the third quarter, at 2.3-million tonnes.

Meanwhile, the company noted that it would continue with drilling programmes in the new year to further boost the positive results it had achieved from exploration drilling concentrated on the northern extension of the historic Atalaya pit.

CEO Alberto Lavandeira described 2016 as a year of project development and ramp-up for the company. “Our results have generated strong production figures and give us significant confidence going forward. We look forward to 2017 as a year of consolidation with further operating improvements and cost efficiencies.”

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.125 0.165s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: