Ongoing exploration success at Kili Teke – Harmony Gold
JOHANNESBURG (miningweekly.com) – Gold mining company Harmony Gold on Wednesday reported “continuing exploration success” at its wholly owned Kili Teke prospect in the Hela province of Papua New Guinea (PNG).
Drilling completed since Harmony reported a maiden Kili Teke mineral resource estimate of 506 000 t of copper and 1.2-million ounces of gold in November shows new near-surface as well as depth extensions.
On the one hand, a 584 m borehole drilled from surface hit grades of more than 0.5% copper and 0.35 g/t gold and on the other, drillers struck even rarer lodes that averaged 13% copper and 11.4 g/t gold.
Harmony CEO Peter Steenkamp described the discoveries as “a rare phenomenon in this day and age”.
In a release to Creamer Media’s Mining Weekly Online, he added that the latest drilling results supported the company’s contention that Kili Teke could develop into a major new porphyry copper-gold system.
He calculated a potential discovery cost of less than $10 a gold equivalent ounce and promised to report more drilling results at the JSE-listed company’s presentation of September quarter results.
In February, Harmony top-brass were peppered with critical analyst questions on the poor results from the Hidden Valley gold mine in PNG, where Harmony is in joint venture (JV) with Newcrest.
After forecasting an output of 300 000 oz/y from Hidden Valley by 2008, output from the JV has yet to rise above the 100 000 oz/y level.
Harmony’s JV with Newcrest at Golpu has also raised analyst eyebrows as its share of the expected $2.6-billion to develop the first phase of Golpu is bigger than its market capitalisation.
But the company has explained that the spreading of the outlay over a long period of time would make it “very affordable and repayable” from current cash flow.
Harmony’s half share of the Golpu ore reserve is 5.5-million ounces of gold and 2.4-million tonnes of copper.
The proposed mine has a 28-year life with the highest-grade sweet spot targeted for first-stage production.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation