Northern Iron Dec quarter output up, lowers 2013 guidance
PERTH (miningweekly.com) - The share prices of iron-ore miner Northern Iron declined by more than 7% on Wednesday, despite the miner reporting record quarterly and monthly production figures.
Concentrate production for the quarter ended December reached 529 000 t, up 24% on the previous corresponding quarter, and up 13% on the last quarter. The full-year 2012 production reached more than 1.9-million tons, which represented a 36% increase over the previous year.
Northern Iron said the increased concentrate production was supported by increased milling and crushing results, with a number of new production records set during the period, including a 72-hour period of milling at nameplate capacity, and a sustained seven-day period where the milling rate averaged 96% of nameplate capacity.
Mine production also achieved a new record of 4.4-million tons, up 6% on the previous quarter, with ore mined up 53% on the previous quarter, to 1.4-million tons.
Concentrate sales for the three months to December were also up by 11%, to 474 000 t on the previous three months, but down 2% on the previous corresponding quarter.
Looking ahead, Northern Iron said it was aiming to build on its 2012 production trends by delivering further increases, as well as a corresponding unit-cost reduction.
The company said the key success factor for 2013 would be improving the performance of the fine crushers, which would enable sustainable higher milling and concentrate production rates.
The company has, however, lowered its expected production rate from 2.7-million tons to 2.6-million tons for 2013, with additional works required during the first quarter to improve the fine crushing circuit.
Northern Iron shares were trading at a low of 45c a share on Wednesday, down from an opening price of 53c a share.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation