North Yorkshire polyhalite project, UK

31st January 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
North Yorkshire polyhalite project.

Location
North Yorkshire, in the UK.

Project Owner/s
Sirius Minerals.

Project Description
A strategic review of the North Yorkshire polyhalite project’s development plan and optimisation opportunities has produced a revised two-stage project development plan, comprising an initial scope of work and a deferred scope of work.

The initial scope will comprise shaft-sinking activities for all four shafts until first polyhalite is achieved and the excavation of Drive 1 of the MTS tunnel to Lockwood Beck. This scope has been selected to deliver the elements of the project considered to be higher construction risks and/or to have the greatest derisking benefit.

The deferred scope incorporates the remainder of construction required to deliver ten-million tonnes a year, ramped-up and operational. The remaining work comprises a more ‘infrastructure’ style risk framework, more consistent with civil construction and more commonly financed in large scale by project finance banks.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The review demonstrates robust project values, with current project net present values for the 13-million-tonne-a-year business case ranging from an estimated $11-billion to $13-billion and internal rates of return ranging from 29% to 35% for a range of development scenarios subject to suc­cessful financing.

Capital Expenditure
The initial scope will cost an estimated $600-million to implement.

Planned Start/End Date
Not stated.

Latest Developments
Based on the work undertaken so far in the strategic review, Sirius has identified several options with the potential to improve the cost and delivery timelines within the deferred scope, and intends to incorporate these options into the revised base case. The cost and schedule estimates incorporating these options are subject to detailed engineering and procurement work that is ongoing and will be finalised before implementing financing for the deferred scope. The strategic review has also identified some further significant opportunities that could potentially benefit the project through cost reduction and schedule acceleration.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Sirius Metals investor relations, Jennifer Wyllie, tel +44 845 524 0247 or email r@siriusminerals.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
Yale Lifting Solutions
Yale Lifting Solutions

Yale Lifting Solutions is a leading supplier of lifting and material handling equipment in Southern Africa. Yale offers a wide range of quality...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.161 0.217s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: