https://www.miningweekly.com

New plant at Balama lowers 2018 guidance

30th July 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A ramp-up review of the Balama project, in Mozambique, has seen graphite producer Syrah Resources adjust its full year production expectations.

The company on Monday said that its new COO Julio Costa’s review had identified graphite recovery performance improvement actions, focused on stable plant flows, increased plant use, and the governance of operating practices to improve process control.

Post the review, Syrah revised its full year production targets to between 135 000 t and 145 000 t of graphite, down from the initial target of 160 000 t, while C1 cash operating costs have been forecast at between $430/t to $450/t, compared with the previous guidance of $400/t.

During the three months to June, the Balama project produced 21 200 t of graphite, compared with the 11 200 t produced in the first quarter.

Syrah told shareholders that mining activities and steady state ore mining at Balama continued to perform well during the June quarter, with some 249 000 t of ore mined, and total material movement slightly ahead of plan.

The mill feed of 258 000 t and the feed grade of 16% were in line with the plan, while the filtration, drying, screening and bagging lines were also performing well, with optimisation continuing as volumes increased.

With a detailed improvement plan now in place, linked to production ramp-up milestones, the average daily production at the Balama operation has increased by 39% post the quarter end, compared with the June quarter, and was on track to achieve some 10 000 t for the month of July.

The Balama operation is forecast to be cash flow positive from late 2018.

Edited by Creamer Media Reporter

Comments

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.103 0.136s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: