https://www.miningweekly.com

New contractor starts 2018 mining season at Eurasia’s West Kytlim

9th March 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – London-listed precious metals producer Eurasia has appointed alluvial mining contractor Techstroy to mine the West Kytlim project, which contains the world’s second-largest alluvial platinum reserve.

The new contractor has hit the ground running, starting site work in the first week of March, which Eurasia said on Friday was a “marked improvement” on the start of its 2017 mining season.

Mining will initially focus on the Malaya Sosnovka site, which contains 275 000 m3 of productive gravels and 84 kg of raw platinum. Mining will progress to the larger Kluchiki site, which contains 893 000 m3 of productive gravels for 319 kg of raw platinum.

Eurasia maintains complete ownership of the project, which is located in the Ural mountains of western Russia. Sales revenues will be split 65:35 in favour of the contractor with no further financial consideration.

Techstroy, based in Nizhny Tagil, will manage mining, trucking and beneficiation of platinum-bearing gravels, including the delivery and installation of mining and processing equipment. The company has committed a fleet of mining equipment to the project including two Komatsu excavators, three bulldozers, one loader and five Kamaz 6520 ore trucks.

Techstroy is permitted to deploy a second washplant during the 2018 mining season.

Eurasia said that its directors were confident that Techstroy had the necessary skill set and balance sheet to execute a successful mining operation.

In mid-October last year, the previous contractor, RegionMetall, discontinued operations as its mining method was sensitive to weather conditions. The contractor only produced 211 oz of raw platinum in the 2017 mining season. Eurasia continued to operate at West Kytlim after RegionMetall stopped operations and produced a further 135 oz of raw platinum using some of the contractor’s equipment and hired machinery.

The project currently has 2 283 kg of raw platinum in reserves with resources and resource potential of a further 10 t of raw platinum.

Edited by Creamer Media Reporter

Comments

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.062 0.098s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: