https://www.miningweekly.com

McEwen Mining Q2 output drops on lower grades

McEwen Mining Q2 output drops on lower grades

Photo by Reuters

18th July 2014

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Precious metals producer McEwen Mining on Thursday reported a 8% drop in consolidated output for the three months ended June 30, mainly owing to lower gold and silver grades at its two operations.

The NYSE- and TSX-listed miner reported total output of 31 200 gold equivalent ounces, comprising 18 863 oz of gold and 740 276 oz of silver, in line with the company’s guidance.

McEwen expects to produce between 135 000 oz and 140 000 oz of gold equivalent, as output is expected to increase in the fourth quarter, driven by a 50% increase in processing capacity at its El Gallo 1 mine, in Mexico, and higher grades at its 49%-owned San José mine, in Argentina.

McEwen’s attributable output from San José was 23 033 oz of gold equivalent, as output was lower year-over-year owing to lower gold and silver grades.

During the second quarter, the El Gallo 1 mine produced 8 167 oz of gold equivalent, 4% lower than the comparable period in 2013, owing to lower gold grades and temporary downtime at the process plant as part of commissioning the plant expansion.

The expansion, which would increase the processing capacity from 3 000 t/d to 4 500 t/d, was completed mid-May and commissioning was currently under way. The mine was expected to be operating at its full capacity by the start of the fourth quarter.

IMPAIRMENT TEST

Further, McEwen said it was conducting an impairment test on its Los Azules project, in Argentina, triggered by the recent acquisition of Lumina Copper by First Quantum Minerals for about C$470-million. Lumina’s only significant asset was the Taca Taca copper project located in Salta, Argentina.

While there were some notable differences between Taca Taca and Los Azules, McEwen believed the similarities in project scale and location within Argentina warranted paying close attention to the Lumina transaction.

The company’s preliminary assessment, which placed a substantial weighting on the announcement-day value of the Lumina transaction to value Los Azules, indicated a pretax asset impairment charge in the range of $90-million to $135-million. The actual amount would be disclosed in the company’s quarterly securities filing.

"With First Quantum acquiring Lumina and [its] Taca Taca project, Los Azules moves to the forefront in terms of world-class, undeveloped, high-grade copper assets not owned by a major mining company. As we have said in the past, Taca Taca serves as a good proxy for the value of Los Azules and we believe this transaction demonstrates value in projects located in Argentina," the company’s chief owner, chairperson and CEO Rob McEwen said.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
South Deep, Rietberg, mineral exploration make headlines
Updated 7 hours ago
Magazine round up | 10 May 2024
Magazine round up | 10 May 2024
10th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.148 0.188s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: