Maniry graphite project, Madagascar
Name of the Project
Maniry graphite project.
Location
Southern Madagascar.
Project Owner/s
Evion, formerly BlackEarth Minerals.
Project Description
The Maniry definitive feasibility study has confirmed a technically robust project that will generate compelling financial returns over a projected mine life of 21 years.
The project consists of two main deposits – Razafy and Razafy Northwest.
An initial 500 000 t/y process plant will be located about 500 m north of Razafy, to be expanded to one-million tonnes a year in Year 3, ready for milling one-million tonnes a year from Year 4.
The project will be completed in stages, with Stage 1 producing 39 000 t/y of concentrate and Stage about 256 400 t/y from Year 4.
Mining will be undertaken using conventional drill-and-blast openpit methods followed by load-and-haul.
Mining equipment will include a mining fleet comprising 60 t to 80 t excavators, while 30-t- to 40-t-capacity trucks will be suited for the scale of mining envisaged.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% ungeared discount rate, of $263-million and an internal rate of return of 33%, with an after-tax payback from first ore of 3.8 years.
Capital Expenditure
Stage 1 will cost about $79.2-million and Stage 2 $24.6-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
CPC Engineering (flowsheet).
Contact Details for Project Information
Evion, tel +61 8 6158 9916 or email info@eviongroup.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation