Lynn Lake gold project, Canada
Photo by Alamos Gold
Name of the Project
Lynn Lake gold project.
Location
Northern Manitoba, Canada.
Project Owner/s
Alamos Gold.
Project Description
Lynn Lake is one of the highest-grade openpit gold deposits in Canada, and comprises two primary sites, MacLellan and Gordon.
The 2017 feasibility study proposes that the deposits be developed using conventional truck-and-shovel openpit mining methods to produce 143 000 ounces of gold. They are expected to operate concurrently for the first six years of operation, with Gordon being depleted first, owing to its higher grades and lower stripping ratio.
As the Gordon pit nears depletion, mining equipment will be transferred to MacLellan and used over the remainder of its mine life. Following preproduction periods, combined mining rates are expected to range between 20.5-million tonnes a year and 27-million tonnes year over the first seven years.
Lynn Lake’s proposed process plant will be a conventional milling and leaching/carbon-in-pulp (CIP) operation with a 7 000 t/d capacity. It will comprise crushing, grinding, thickening, pre-aeration and leaching, CIP, cyanide detoxification, carbon elution and regeneration, and gold smelting.
Over the life-of-mine, combined gold recoveries are expected to average 92%. A tailings management facility will be built about 3 km north-east of the planned openpit and plant site at MacLellan.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Not stated.
Planned Start/End Date
Not stated.
Latest Developments
Since the completion of the 2017 feasibility study, exploration success around the Gordon and MacLellan deposits has driven a 27% increase in mineral reserves to 2.1-million ounces of gold grading 1.75 g/t of gold.
This growth, along with additional exploration success over the past several years, will be incorporated into an updated feasibility study, which is expected to be completed during the first half of 2023.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Alamos Gold, tel +1 416 368 9932 or email info@alamosgold.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation