Lindsay's a step closer towards development – KalNorth
PERTH (miningweekly.com) – The Lindsay’s gold project, in Western Australia, is a step closer to development after Aim-listed Keras Resources exercised an option to develop the mine.
ASX-listed KalNorth Gold Mines and Keras in March this year inked a heads of agreement to allow Keras an exclusive option to mine the current Joint Ore Reserves Committee-compliant resource at Lindsay’s through openpit and underground mining at the deposit known as Parrot Feathers.
The Lindsay’s mine incorporated a total resource of 215 000 oz of gold, of which 77% was classified as indicated. The high-grade Parrot Feathers deposit contained 54 000 oz of this gold.
Having exercised its openpit mining option, Keras would now have to prepare and submit an openpit mining proposal within four weeks, with the company proposing to start a 10 000 t bulk sample collection through the exploration trial decline at Parrot Feathers under a programme of works licence concurrent with the openpit operation.
The bulk sample was expected to provide grade and geotechnical data for an underground feasibility study, as well as test material for the optical sorting equipment.
Both Keras and KalNorth would now seek regulatory mining approvals and would finalise and execute a formal agreement prior to the start of mining operations.
KalNorth executive director Lijun Yang said on Tuesday that the start of openpit mining by Keras would enable KalNorth to receive cash flow with zero risk, under the current gold price environment.
Profit from Lindsay’s would be split on a 51:49 basis in KalNorth’s favour, after deducting royalties, operating costs and management fees for the Keras team, if the gold price was at A$1 600/oz or less.
At a gold price of A$1 600/oz or higher, the split would be 70:30 in favour of KalNorth.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation