https://www.miningweekly.com

In wake of defending against dissident shareholder, Taseko reports wider Q1 loss

14th May 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – After enduring a rollercoaster first quarter in which a dissenting shareholder launched a scathing proxy contest against which base metals miner Taseko Mines had successfully defended itself, the company this week reported a wider adjusted loss than expected.

Excluding special items, Taseko reported a C$15.7-million wider net loss of C$18-million, or C$0.08 a share, missing analyst expectations by a penny.

The net loss for the period ended March 31 improved by C$23.7-million, to a loss of C$1.5-million, or C$0.01 a share, compared with a net loss of C$25.2-million, or C$0.11 a share.

“First-quarter results were impacted by lower copper grades, which were forecast in Gibraltar’s 2016 operating budget. In the current low copper price environment, our focus will remain on operating costs, which in the first quarter were maintained at a very low cost per ton milled of $9.59.

“The average realised copper price for the quarter was $2.10/lb, which is the lowest pricing quarter since the first quarter of 2009. Considering the copper price and grade Gibraltar processed in the first quarter, it is impressive we were able to generate break-even earnings from mining operations,” stated president and CEO Russell Hallbauer.

Output from the company’s flagship 75%-owned Gibraltar mine, in British Columbia, rose by 400 000 lbs to 28.8-million pounds during the quarter. Sales improved by 5.1-million pounds of copper to 30.5-million pounds, which contributed to lift revenues by C$3.1-million to C$58.2-million during the period.

Site operating costs, net of by-product credits, were $1.78/lb produced and total C1 operating costs were $2.11/lb produced.

Gibraltar’s copper output for 2016 was expected to be in the range of 130-million to 140-million pounds.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.059 0.095s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: