https://www.miningweekly.com
Construction|Contractor|Gold|Mining|PROJECT|Resources
Construction|Contractor|Gold|Mining|PROJECT|Resources
construction|contractor|gold|mining|project|resources

Hummingbird taking steps to address mining dilution, ore loss at Yanfolila

16th April 2019

By: Creamer Media Reporter

     

Font size: - +

Aim-listed Hummingbird Resources' Yanfolila gold mine, in Mali, produced 23 807 oz of gold in the first quarter of this year, up 33% from the 17 895 oz produced in the fourth quarter of 2018.

Mining rates were, however, lower than expected.

"In the period, production was impacted by ore depletion from the Komana West pit from historical artisanal workings, which was greater than forecast in the reserve model. We are taking immediate steps to reverse the impact of this dilution through working closely with the mine contractor and, as we progress deeper in the pits, the impact of this is expected to reduce significantly in the near term as we access areas of expected higher-grade ore," CEO Dan Betts said on Tuesday.

Despite the lower-than-expected first-quarter output, Hummingbird is confident the mine will meet its full-year production guidance of 110 000 oz to 125 000 oz.

However, as a result of additional costs being incurred to deal with mining technique changes and plant availability, the full-year all-in sustaining cost may be higher than the previously guided $800/oz to $850/oz, the company warned.

Meanwhile, Betts said the company was looking forward to receiving an updated reserve/resources report in the second quarter, which would allow it to publish a new life-of-mine plan for Yanfolila. 

"It is also pleasing to note the strong progress we have made on the second ball mill project and we look forward to the positive impact that will bring to our process plant capacity once completed," he added.

The construction of a second ball mill at the mine is on track for completion in the third quarter of this year.

The second ball mill will increase the processing plant's throughput capacity to 1.24-million tonnes a year, compared with the current one-million tonnes a year.

 

 

 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.159 0.202s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: