Hillgrove reports solid quarter
PERTH (miningweekly.com) – Copper miner Hillgrove Resources has reported solid production in the third quarter, despite it being only a two-month quarter as the company aligned its financial year to the calendar year.
For the two months ended September, Hillgrove’s Kanmantoo copper mine, in South Australia, delivered 4 429 t of concentrate, which was at the upper end of forecast guidance for the third quarter.
Including the month of July (to replicate a three-month quarter for comparative purposes), September quarter production increased to 6 331 t of concentrate, which was a record performance when compared with the 5 884 t delivered in the second quarter, which ended in July.
Hillgrove reported on Monday that while ore mining was interrupted during the quarter by some end-of-winter rains, the mined primary grade during August and September was higher than 1% copper.
The processing plant at Kanmantoo also performed very well during the quarter, with the new screening system, installed over the last quarter, continuing to operate to expectations. Mill throughput was also above plan, with recovery and costs in line with expectations.
During the two months under review, Hillgrove reported a revenue of A$36-million, while year-to-date revenue was reported at A$128.5-million.
Looking ahead, Hillgrove was expected to produce between 20 500 t and 22 500 t of copper in concentrate during the 11 months to December, while gold production would reach between 6 000 oz and 7 800 oz.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation