https://www.miningweekly.com
Construction|Design|Engineering|EPCM|Infrastructure|PROJECT|Technology|Infrastructure
Construction|Design|Engineering|EPCM|Infrastructure|PROJECT|Technology|Infrastructure
construction|design|engineering|epcm|infrastructure|project|technology|infrastructure

Hastings awards EPCM contract at Yangibana

21st October 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Hastings Technology Metals has awarded a A$350-million engineering, procurement and contract management (EPCM) contract to project house DRA Pacific at its Yangibana rare earths processing plant, in Western Australia.

Hastings said on Monday that the EPCM contract was the single largest dollar value contract associated with the Yangibana project, with the award representing another critical milestone for the project.

The one-million-tonne-a-year Yangibana operation is expected to produce some 15 000 t/y of mixed rare earths carbonate, and about 8 850 t/y of total rare-earth oxides over ten years, with Hastings expected to spend some A$427-million to bring the project online.

The EPCM contract will cover all aspects of the design and construction of the processing facility and the associated non-process infrastructure capable of producing the mixed rare earth carbonate.

“The award of the EPCM contract moves the Yangibana rare earth project firmly into development phase to commence project execution and progress to production of our mixed rare earth carbonate by 2022,” said Hastings chairperson Charles Lew.

Edited by Creamer Media Reporter

Comments

Latest News

The Mogalakwena mine in South Africa
BHP considering improved proposal for Anglo American, sources say
Updated 2 hours 8 minutes ago By: Reuters

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.142 0.178s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: