https://www.miningweekly.com
Cleaning|Construction|Crushing|Design|Dewatering|Engineering|Filtration|flotation|Mining|PROJECT|Project Management|Screen|Screening|Services|Storage|Water|Equipment|Infrastructure
Cleaning|Construction|Crushing|Design|Dewatering|Engineering|Filtration|flotation|Mining|PROJECT|Project Management|Screen|Screening|Services|Storage|Water|Equipment|Infrastructure
cleaning|construction|crushing|design|dewatering|engineering|filtration|flotation|mining|project|project-management|screen|screening|services|storage|water|equipment|infrastructure

Goulamina lithium project, Mali – update

Image of lithium core from the Goulamina project

18th November 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Goulamina lithium project.

Location
Southern Mali, about 50 km west of Bougouni.

Project Owner/s
Firefinch subsidiary Leo Lithium, and Chinese partner Jiangxi Ganfeng Lithium.

Project Description
An update to the October 2020 Goulamina definitive feasibility study (DFS) in December 2021 has confirmed that the project is among the world’s biggest lithium developments.

Stage 1 spodumene concentrate production is estimated at 506 000 t/y, increasing to a peak of 880 000 t/y in Stage 2. The DFS envisages a standard openpit mining operation.

The flowsheet will comprise:

• three-stage crushing to a P80 of 6.2 mm, with a fine-ore bin and overflow dead stockpile;

• closed-circuit ball milling and screening to an estimated P80 of 180 µm, based on a closing screen P100 of 212 µm;

• two-stage magnetic separation;

• three-stage flotation (roughing, cleaning and recleaning);

• concentrate dewatering, filtration and storage;

• separate flotation and process tailings thickening, with common tailings pumped to a tailings storage facility;

• reagent mixing and distribution;

• separate flotation and process water circuits; and

• air services.

The DFS update proposes the construction of a 2.3-million-tonne-a-year throughput plant, incorporating in the design the infrastructure and equipment for the construction of a Stage 2 expansion to increase plant throughput to four-million tonnes a year.

The project is expected to have a minimum mine life of 21 years, producing 15.6-million tonnes of spodumene concentrate over that period.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $4-billion and an internal rate of return (real) of 97.8%.

Capital Expenditure
Stage 1 will cost about $255-million and Stage 2 $70-million.

A formal investment decision on Goulamina was taken in March in 2022.

Planned Start/End Date
Firefinch expects to complete construction in early 2024 and commissioning in about mid-2024, with full production expected in 2025.

Latest Developments
Leo Lithium has finalised a shipping solution for product from its Goulamina lithium project.

The company has signed an agreement with SEA-Invest for port services, including product unloading, storage and shiploading at the Abidjan port.

Under the agreement, Leo has secured warehouses with a footprint of 9 000 m2  on the wharf of the Port of Abidjan, equating to about 60 000 t of product storage. The agreement stipulates a minimum product throughput of 250 000 t/y; however, there is no upper limit on quantities that can be exported.

The agreement also includes handling unit rates and loading rates, which are in line with cost forecasting in the DFS update, Leo Lithium has said.

Key Contracts, Suppliers and Consultants
Lycopodium (updated DFS and engineering procurement and associated project management services contract).

Contact Details for Project Information
Firefinch, tel +61 8 6149 6100 or email info@firefinchltd.com.

Edited by Creamer Media Reporter

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.293 0.388s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: