https://www.miningweekly.com
Cleaning|Construction|Crushing|Design|Dewatering|Filtration|flotation|Mining|PROJECT|Screen|Screening|Services|Storage|Water|Equipment|Infrastructure|Operations
Cleaning|Construction|Crushing|Design|Dewatering|Filtration|flotation|Mining|PROJECT|Screen|Screening|Services|Storage|Water|Equipment|Infrastructure|Operations
cleaning|construction|crushing|design|dewatering|filtration|flotation|mining|project|screen|screening|services|storage|water|equipment|infrastructure|operations

Goulamina lithium project, Mali

Image of a drill rig at the Goulamina project, Mali

15th April 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Goulamina lithium project.

Location
Southern Mali, about 50 km west of Bougouni.

Project Owner/s
Leo Lithium, a subsidiary of Firefinch.

Project Description
An update to the October 2020 Goulamina definitive feasibility study (DFS) in December 2021 has confirmed that the project is among the world’s biggest lithium developments.

Stage 1 spodumene concentrate production is estimated at 503 000 t/y, increasing to a peak of 831 000 t/y in Stage 2.

Spodumene concentrate production over the 21-year life-of-mine is estimated at 15.6-million tonnes.

The DFS envisages a standard openpit mining operation using drill, blast, excavation and truck haulage. Contractors will be employed for mining operations.

The flowsheet will comprise:

  • three-stage crushing to a P80 of 6.2 mm, with a fine-ore bin and overflow dead stockpile;
  • closed-circuit ball milling and screening to an estimated P80 of 180 µm, based on a closing screen P100 of 212 µm;
  • two-stage magnetic separation;
  • three-stage flotation (roughing, cleaning and recleaning);
  • concentrate dewatering, filtration and storage;
  • separate flotation and process tailings thickening, with common tailings pumped to a tailings storage facility;
  • reagent mixing and distribution;
  • separate flotation and process water circuits; and
  • air services.

The DFS update proposes the construction of a 2.3-million-tonne-a-year throughput plant, incorporating in the design the infrastructure and equipment for the construction of a Stage 2 expansion to increase plant throughput to four-million tonnes a year. The expansion of the plant will take place after commissioning of Stage 1 and be commissioned about 18 months after commissioning.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $4-billion and an internal rate of return (real) of 97.8%.

Capital Expenditure
Stage 1 will cost about $255-million and Stage 2 $70-million

Planned Start/End Date
A formal investment decision on Goulamina was taken in March in 2022.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Firefinch, tel +61 8 6149 6100 or email info@firefinchltd.com.

Edited by Creamer Media Reporter

Comments

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.133 0.186s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: