https://www.miningweekly.com
Gold|Mining|Underground
Gold|Mining|Underground
gold|mining|underground

Galantas intersects Kearney vein on second mining level

11th February 2019

By: Creamer Media Reporter

     

Font size: - +

Gold junior Galantas Gold is continuing to advance the Omagh underground mine in Northern Ireland and has now intersected the Kearney vein on a second mining level.

The miner has progressed the main decline development tunnel to 52 m past a 50-m-long access branch on the 1 084 level (second level), driven east from the main decline tunnel to its injunction with the Kearney vein, north of the planned mining area.

A southwards on-vein development, on the Kearney vein, on the 1 084 level, to access beneath the first mining area, has started. Galantas says the interval between the levels is planned to be mined by a long-hole method, using cemented rock and tailings as backfill support.

The company notes that drill-core OM-DD-06-14 has intersected strong gold mineralisation some 7 m to the south of the junction of the 1 084 access and the Kearney vein. This core returned an intersection of grade 10.3 g/t gold over a down-hole length of 3 m. This included 1 m at 27.42 g/t gold, 170.84 g/t silver and 6.52% lead.

Further, Galantas reports that the main decline development continues towards the 1 072 level to enable the mining of the next production sequence. A further 43 m remains to be excavated on the decline to reach the 1 072 level, before making a 58 m vein access drive.

On-vein drivage on the 1 072 level, which is the third level in the vertical sequence, is planned to provide future mining access.

In addition, an access tunnel westwards from the decline tunnel, towards the Joshua vein has been continued and currently has been driven a total of 56 m out of an anticipated 344 m. A second means of egress that is required as an escapeway and to form a ventilation circuit, has been completed. Arrangements are being put in place to install the mine main ventilation fans which have already been delivered to site.

Edited by Creamer Media Reporter

Comments

Projects

Location map of the Antler copper project
Antler copper project, US – update
Updated 2 hours 51 minutes ago By: Sheila Barradas

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.055 0.084s - 89pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: