Name of the Project
Gakara rare earths project.

Location
The Gakara mining licence is located within the north-eastern Kibaran belt, in the Bujumbura province of western Burundi.

Client
Rainbow Rare Earths has a 90% interest in the project, with a nondilutable 10% owned by the Burundi government.

Project Description
Gakara is one of the highest-grade – 47% to 67% total rare-earth oxide (TREO) – rare earths projects globally.

The project hosts a deposit with a very high run-of-mine grade of 54.3% on average TREO for 141 853 t of contained TREO, with high-quality and well understood mineralogy.

The high grade of the vein material is expected to enable Rainbow to pursue a low-risk processing route. Owing to the minimal level of processing required, complex and expensive processing facilities and the use of hazardous chemicals will not be required.

Rainbow is fast-tracking the project into production and will produce a high-grade concentrate using simple mining.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Value
Not stated.

Duration
First sales of concentrate are expected by the end of 2017.

Latest Developments
Rainbow Rare Earths has exported its first shipment of rare-earth concentrate from its Gakara project, making it Africa’s only rare earths producer.

Gakara is one of the highest-grade rare-earth element mining projects globally, with an estimated in situ grade of 67% TREO.

High-grade rare earths from Burundi have been shipped to Kenya.

“From there, it will be shipped to end customers secured by steel producer Thyssenkrupp raw materials, under the existing distribution and offtake agreement for up to 10 000 t/y of rare-earth concentrate material,” has said CEO Martin Eales has said in an update.

He has noted that the company is targeting production of 5 000 t/y by the end of 2018 and expects to progress to truck convoy shipments on a weekly basis during the first quarter of 2018 as production increases. 
  
Since its initial public offering in January, Rainbow has targeted first production and sales of its mineral concentrate before the end of the calendar year. 

The company has added that the processing plant at Kabezi is now fully constructed, with final commissioning under way. This process is expected to take about two weeks and the plant is expected to be fully operational before the end of December.
  
Key Contracts and Suppliers

Obsideo Consulting (EPCM).

On Budget and on Time?
The project is firmly on track to deliver its first shipment of concentrate from the mine in the fourth quarter of this year.

Contact Details for Project Information
Rainbow Rare Earths, email info@rainbowrareearths.com.
 

Edited by Creamer Media Reporter

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (26/04/2024)
Updated 1 hour 49 minutes ago By: Martin Creamer

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.171 0.208s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: