https://www.miningweekly.com
Excavators|Gold|Mining|PROJECT|Resources|Trucks|Operations
Excavators|Gold|Mining|PROJECT|Resources|Trucks|Operations
Excavators|gold|mining|project|resources|trucks|operations

Fortitude gold mine – Stage 2, Australia

4th October 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Fortitude gold mine – Stage 2.

Location
The project is located within the Lake Carey gold project, in the Eastern Goldfields of Western Australia.

Project Owner/s
Matsa Resources.

Project Description
A mining study has reported highly positive results for the project and that under current market conditions, Fortitude can be economically mined.

Fortitude has total indicated and inferred mineral resources of 5.45-million tonnes grading 2 g/t gold.

Maiden ore reserves have been declared at 1.03-million tonnes at 1.8 g/t gold, with potential for a substantial increase of gold ore reserves in the near term.

It is estimated that about 54 400 oz of gold could be recovered over a 22-month period.

The study envisages a conventional openpit operation involving 120 t backhoe excavators and 90 t trucks.

The ore will be processed at one of three nearby ore-treatment facilities.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The total cost of the Stage 2 mining operation to Matsa is A$95.3-million and comprises: startup costs of A$6.6-million, including A$5.1-million for prestripping, mining and haulage costs of A$43.1-million, and processing costs of A$45.6-million.

Planned Start/End Date
Not stated.

Latest Developments
All statutory and regulatory approvals are in place for mining to start immediately.

Based on the positive outcomes of the Stage 2 mining study, Matsa plans to immediately progress with plans to put the mining contract out to tender, finalise ore purchase and treatment options, and secure project financing to facilitate the start of the Stage 2 operations.

Matsa has initiated discussions with AngloGold Ashanti with respect to an ore purchase arrangement for the Stage 2 operations.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Matsa Resources, tel +61 8 9230 3555 or email reception@matsa.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Lion Alcoblow ® - High speed breathalyser

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.204 0.261s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: