https://www.miningweekly.com
Construction|Flow|Gold|Mining|PROJECT|Project Management|Resources|Underground|Flow|Operations
Construction|Flow|Gold|Mining|PROJECT|Project Management|Resources|Underground|Flow|Operations
construction|flow-company|gold|mining|project|project-management|resources|underground|flow-industry-term|operations

Fortitude gold mine, Australia

Image of gold ore

15th October 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Fortitude gold mine.

Location
Eastern Goldfields of Western Australia.

Project Owner/s
Matsa Resources.

Project Description
Robust results from an updated optimisation study has enhanced Fortitude’s value by effectively doubling its mine life, production output and cash flow.

The study has been driven by the recently announced revised mineral resource estimate of 8.05-million tonnes grading 1.9 g/t gold, and was completed using a conceptual conventional openpit mining operation, with ore hauled and processed at a conceptual Matsa processing plant at Fortitude.

Mine production has increased from 58 000 oz of gold to about 132 000 oz of gold.

Production of 2.7-million tonnes at 1.6 g/t gold, about 124 00 oz at 93% recovery, is estimated over four years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not covered in the updated optimisation study.

Capital Expenditure
Not covered in the updated optimisation study.

Planned Start/End Date
Not stated.

Latest Developments
Potential for additional production through an underground operation is being investigated.

Matsa will further conduct scenario modelling for 600 000 t/y, 800 000 t/y and one-million-tonne-a-year processing rates.

Matsa will also conduct relevant study work associated with the construction and management of a processing plant at Fortitude, and will work to amend the existing mining proposal and project management plan to capture larger mining operations and a potential processing plant.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Matsa Resources, email reception@matsa.com.au.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.104 0.157s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: