https://www.miningweekly.com

Floods hamper restart of Qld coal exports

Floods hamper restart of Qld coal exports

Photo by Bloomberg

3rd April 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The resumption of coal exports from Queensland could be delayed by several weeks, as the state recovers from the damage caused by cyclone Debbie, which hit last week.

The Goonyella system, which connects the Darymple Bay coal terminal and the Hay Point coal terminal, has been closed since March 28, as a result of severe flooding.

Aerial inspections have been conducted and a programme of work is being assessed and planned, with freight operator Aurizon saying on Monday that road and rail access to the rail corridor was severely limited, especially around the Black Mountain area, where initial assessment has indicated that significant landslips have occurred.

Aurizon said the company would examine alternative routing opportunities for its impacted customers and rail operators as its other rail systems became available in the coming weeks, from the western section of the Goonyella system, north to the Newlands system to Abbot point coal terminal, and south to the Port of Gladstone.

It was currently estimated that the recovery of the Goonyella rail infrastructure could take as much as five weeks.

Mining giant BHP Billiton, which also uses the Goonyella rail line to service several of its coal mines in the region, on Monday said it would seek to manage ongoing access to ports and shipments to customers.

The miner said in a statement that the Hay Point terminal was ready to receive coal.

BHP noted that dewatering infrastructure installed at its mines after the 2011 floods were working as designed and that all sites were now resuming operations and ramping up production.

The miner holds an interest in 11 coal mines in the Bowen basin. Nine of these are held in joint venture with Mitsubishi, of which seven are operational and two are on care and maintenance, while BHP Billiton Mitsui Coal owns two mines.The 55-million-tonne-a-year Hay Point coal terminal is also held by the BHP Mitisubishi alliance.

Meanwhile, coal producer Peabody Energy said that its mines in the region have also restarted operations, the outages of the rail systems were preventing coal shipments from mine to port.

The US major noted that it was still too early to assess the impact on volumes and the results of the delays in transporting coal to the export market, or the impact of the delays on the second quarter price negotiations with metallurgical coal customers.

Australian producer Stanmore Coal has also said delays due to transport service delivery and potential extended shipping queues may impact sales for the remainder of 2017.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Projects

Image of lithium ore
Bougouni lithium project, Mali – update
Updated 2 hours 17 minutes ago By: Sheila Barradas

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.172 0.21s - 107pq - 2rq
Subscribe Now