https://www.miningweekly.com
Engineering|Gold|Mining|PROJECT|Projects|Environmental
Engineering|Gold|Mining|PROJECT|Projects|Environmental
engineering|gold|mining|project|projects|environmental

First Mining declares Springpole reserve as it marks PFS milestone

View from the Springpole site

View from the Springpole site

20th January 2021

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Toronto-listed First Mining on Wednesday announced the results of a prefeasibility study (PFS) for its Springpole gold project and declared the project’s first-ever mineral reserves.

Springpole, in Red Lake, has proven and probable reserves of 3.8-million ounces of gold and 20.5-million ounces of silver, the company said.

One of the largest undeveloped openpit gold projects in North America, Springpole currently hosts 4.6-million ounces of gold in the indicated mineral resource category and 0.3-million ounces of gold in the inferred mineral resource category.

“First Mining is declaring mineral reserves for the first time ever on the Springpole gold project, reflecting the culmination of a year of detailed data collection, trade-off studies, and engineering and technical de-risking work done by First Mining and our partners on our project team,” said CEO Dan Wilton.

The PFS evaluates recovery of gold and silver from a 30 000 t/d openpit operation. The project will produce an average of 335 000 oz/y, at an all-in sustaining cost of $577/oz in the first nine years of the 11.3 mine life.

The study calculated an after-tax net present value of $995-million and an internal rate of return of 29%.

Initial capital costs are estimated at $718-million, sustaining capital costs at $55-million, plus $29-million in closure costs.

“The work we have undertaken to date to reduce the potential environmental impact from the project demonstrates the potential for Springpole to be developed in a responsible manner and to mitigate long-term impacts. We look forward to the project's continual improvement through collaboration with our local and Indigenous communities of interest as we advance Springpole through the federal and provincial environmental assessment processes,” Wilton said.

Edited by Creamer Media Reporter

Comments

Showroom

Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.112 0.15s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: