https://www.miningweekly.com

Firestone Diamonds gears up for first sale as Liqhobong ramps up

26th January 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Aim-listed Firestone Diamonds has scheduled its first diamond sale, in Antwerp, from February 6 to 10, as its Liqhobong mine, in Lesotho, ramps up to full output.

In the three months ended December 31, the company recovered over 20 special stones larger than 10.8 ct from the mine, including a 37 ct white diamond and several fancy yellow diamonds.

Diamond recoveries started in late October.

"Construction activities at Liqhobong were completed early in the [December] quarter and we are currently in the commissioning and ramp-up stage of the project. We have been pleased with the tonnes processed by the plant, which has already seen nameplate production reached on multiple occasions at this early stage of ramp-up,” said CEO Stuart Brown.

Further, through the processing of lower-grade stockpiles and diluted ore, the company was able to produce 58 000 ct, at a grade of 14.4 carats per hundred tonnes.

Firestone expects to host two sales every quarter, with the second auction of this quarter due to be held late in the quarter.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

Gold bar
Oriole sells royalty over Türkiye project
Updated 1 hour 48 minutes ago By: Lumkile Nkomfe

Showroom

Sweet-Orr
Sweet-Orr

Sweet-Orr, established in 1871, is a global leader in superior protective workwear, known for quality, innovation, and performance.

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 18 September 2026
Magazine round up | 18 September 2026
18th September 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.064s - 111pq - 2rq
Subscribe Now