https://www.miningweekly.com

Evolution buys project from Newcrest, reports Sept quarter production results

17th October 2016

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Gold miner Evolution Mining has reported a slight decline in September quarter production and has announced the acquisition of a new project as a potential extension for its Cowal mine, in New South Wales.

Production for the period under review reached 205 307 oz, compared with the 216 644 oz produced in the previous quarter, while all-in sustaining costs dropped from the A$1 117/oz reported in the three months to June, to A$1 060/oz.

The Cowal mine produced 64 032 oz during the quarter under review, while Edna May and Mungari, both in Western Australia, produced 20 012 oz and 38 295 oz respectively.

In Queensland, the Mt Carlton mine produced 25 544 oz, while the Mt Rawdon operation delivered 24 878 oz. The Cracow mine also produced 21 554 oz of gold during the quarter under review, with Pajingo producing 10 991 oz of gold for the September quarter, before its sale to Minjar Gold was completed at the start of September.

During the quarter under review, Evolution paid A$880-million to gain a 30% stake in the Ernest Henry operation, in Queensland, entitling it to 100% of the gold production at the mine, subject to an agreed life-of-mine and block model.

The acquisition added about 85 000 oz/y to Evolution’s bottom line.

Meanwhile, the miner reported that it planned to buy the Marsden copper/gold project from Newcrest for A$10-million.

The project, which has an indicated and inferred resource of 180-million tonnes, grading 0.2 g/t gold and 0.38% copper for 1.1-million ounces of gold and 670 000 t of copper, is located immediately to the south-east of the Cowal gold mine, and is the nearest known sizeable mineral deposit to the Cowal mine, outside of the Cowal tenement package.

Executive chairperson Jake Klein said the Marsden project provided long-term optionality for the Cowal operation, and had the potential to further extend the life of what is already a long-life operation.

A technical review by Evolution showed that the potential to develop the Marsden deposit is enhanced by using the Cowal milling circuit and associated infrastructure.

The current Cowal treatment facility is unable to treat the Marsden material concurrently with the Cowal ore, and any option involving the processing facilities at Cowal would only come at the end of the mine life.

Edited by Creamer Media Reporter

Comments

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.19 0.227s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: