Ernest Henry mine extension, Australia

LOcation map of the Ernest Henry Mine

Photo by Evolution Mining

25th August 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ernest Henry mine extension.

Location
About 38 km north-east of Cloncurry, in Queensland, Australia, on the traditional lands of the Mitakoodi people.

Project Owner/s
Evolution Mining.

Project Description
A prefeasibility study (PFS), based on the December 2022 mineral resource estimate, has shown a compelling opportunity to extend the Ernest Henry sublevel cave operation until 2040, targeting the production of 80 000 oz/y of gold and 50 000 t/y of copper.

The PFS has evaluated options for the continuation of sublevel cave mining below the 1125 mRL, comparing conventional trucking with a crushing and conveyor system, with due consideration for future geological upside.

The PFS has determined both options are value accretive, but the crushing and conveyor option provides greater economic upside and optionality than anticipated.

It provides for about 56-million additional ore tonnes milled, 609 000 oz of additional gold produced and 343 000 t of additional copper produced.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value of between $690-million and $1.01-billion at $2 400/oz and $2 965/oz respectively, and an internal rate of return of 28% to 38%. Payback is estimated at between 1.2 years and nine months after first ore.

Capital Expenditure
Capital expenditure is estimated at between $450-million and $500-million. Based on the timings in the PFS, the majority of this capital is not required until the 2027 and 2028 financial years.

Planned Start/End Date
Not stated.

Latest Developments
Evolution has approved the project to advance to the feasibility study, which is expected to be completed in the March quarter of 2025.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Evolution Mining, tel +61 2 9696 2900.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.126 0.182s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: