https://www.miningweekly.com
Business|Cleaning|Contractor|Crushing|Excavator|flotation|Flow|Mining|PROJECT|Resources|Services|Trucks|Waste|Flow|Waste|Operations
Business|Cleaning|Contractor|Crushing|Excavator|flotation|Flow|Mining|PROJECT|Resources|Services|Trucks|Waste|Flow|Waste|Operations
business|cleaning|contractor|crushing|excavator|flotation|flow-company|mining|project|resources|services|trucks|waste-company|flow-industry-term|waste|operations

Epanko graphite project, Tanzania

31st May 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Epanko graphite project.

Location
Tanzania.

Project Owner/s
Kibaran Resources.

Project Description
An updated bankable feasibility study (BFS) has demonstrated a highly robust business case for a 60 000 t/y operation at Epanko and has also substantially enhanced and derisked the project’s development.

The project has an ore reserve of 11.7-million tonnes grading 8.32% total graphitic carbon (TGC) for 971 000 t graphite supporting an 18-year mine life.

The BFS is based on a mining contractor scenario.

Mining will be undertaken using the conventional drill-and-blast technique, with the fleet comprising an 80 t backhoe excavator and 40 t off-highway haul trucks.

Mining operations will start in the Eastern pit and progress to the Western pit in Year 6 to the scheduled reserve exhaustion in Year 16. The average life-of-mine strip ratio is expected to be 0.4:1 (waste to ore).

The Western deposit entails mining a strike length of 1 360 m along the top of the ridge to a depth of 210 m in the south. 

The Eastern deposit, located partially over a hill within a small valley, will be mined to a depth of 125 m and will have a strike extent of 350 m.

The process plant is designed with a throughput capacity of 720 000 t/y for an average TGC grade of 96% and average production of 60 000 t/y. The plant is based on a crush-and-grind comminution circuit (two-stage crushing circuit with single-stage rod mill), followed by rougher flotation.

The tailings are reground in a ball mill before entering the scavenger flotation. The rougher and scavenger concentrates will be combined and transferred into the primary cleaner section comprising polishing mills and cleaner flotation banks.

The concentrate will then be screened into fractions of two sizes, with subsequent polishing and four-stage cleaning, and no further milling required in the cleaning circuit.

The product will be dewatered, dried and screened into saleable size fractions. The flow sheet is optimised for a high yield of large flakes; however, it could be easily modified to get higher carbon content by flotation if required. There is potential to extend the forecast mine life beyond 18 years.

Potential Job Creation
The project is expected to employ about 300 Tanzanians and will create up to 4 500 indirect jobs through the local supply of goods and services.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $211-million and an internal rate of return of 38.9%, with a 3.4-year payback.

Capital Expenditure
Capital costs have been estimated at $88.9-million.

Planned Start/End Date
The project will take about 19 months to complete.

Latest Developments
The Tanzanian government has given its in-principle approval for Kibaran Resources’ debt financing arrangements for its Epanko graphite project.

Kibaran in April this year mandated Germany’s KfW IPEX-Bank to provide debt funding to develop the Epanko project.

The approval from government will enable KfW to progress the untied loan guarantee (UFK) submission for the German government inter-Ministerial committee, and signify that processes for arranging financing and related UFK cover applications have started.

This process could take several months to complete.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Kibaran Resources, tel +61 8 6424 9000 or email info@kibaranresources.com.
 
 

 

 

 

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.126 0.182s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: