https://www.miningweekly.com
Construction|Explosives|Gold|Mining|PROJECT|Surface|Equipment|Maintenance|Drilling|Infrastructure
Construction|Explosives|Gold|Mining|PROJECT|Surface|Equipment|Maintenance|Drilling|Infrastructure
construction|explosives|gold|mining|project|surface|equipment|maintenance|drilling|infrastructure

Enchi gold project, Ghana – update

Location map of Enchi gold project

Location map of Enchi gold project

10th September 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Enchi gold project.

Location
Aowin district of Western Region, in south-west Ghana.

Project Owner/s
Newcore Gold.

Project Description
A preliminary economic assessment (PEA) has shown Enchi to be an economically robust, low-capital intensity, heap-leach project.

The project has an inferred mineral resource of 70.4-million tonnes grading 0.62 g/t containing 1.4-million ounces of gold.

The updated PEA envisages an openpit, heap-leach operation with a low strip ratio, using contract mining and processing 6.6-million tonnes a year and producing 983 296 oz over the 11-year mine life.

Mining will occur in a series of ten openpits across the Sewum, Boin, Nyam and Kwakyekrom deposits, with depth ranging from 20 m to 180 m. 

The heap-leach facility will be built in three phases, with excess capacity available.

Infrastructure for the project includes mine dry facilities, equipment, a maintenance workshop, refuelling facilities, an explosives magazine, office administration facilities, an assay laboratory and warehouse facilities.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $333-million and an internal rate of return of 54% at a gold price of $1 650/oz, with a payback of 2.3 years.

Capital Expenditure
$97-million.

Planned Start/End Date
Construction is expected to take 15 months.

Latest Developments
Newcore announced in August 2021 that, on the back of the drilling success achieved at the Enchi gold project and the completion of an $11.5-million equity financing, the company had increased its 2020 to 2021 drill programme to 90 000 m.

Newcore also announced additional drill results, with drilling at the Boin gold deposit at Enchi intersecting 1 g/t of gold over 103 metres from 113 m, as well as an additional near-surface interval in the same hole of 0.63 g/t of gold over 40 m from 27 m.

Drilling at the Sewum gold deposit at Enchi has intersected 0.63 g/t of gold over 77 m from 4 m, including 0.72 g/t of gold over 36 m from 4 m in the oxides and 1.22 g/t of gold over 14 m from 53 m in the sulphides. These results continue to encounter wide zones of mineralisation near surface, expanding the mineralised area outside the existing pit constrained resource.

Key Contracts, Suppliers and Consultants
BBA (PEA).

Contact Details for Project Information
Newcore Gold, tel + 1 604 484 4399 or email info@newcoregold.com.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
SBS Tanks
SBS Tanks

SBS® Tanks is a leading provider of innovative water security solutions with offices in Southern Africa, East and West Africa, the USA and an...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.116 0.172s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: