https://www.miningweekly.com
Dewatering|Exploration|Gold|Infrastructure|Mining|Resources|Surface|Underground|Drilling|Infrastructure
Dewatering|Exploration|Gold|Infrastructure|Mining|Resources|Surface|Underground|Drilling|Infrastructure
dewatering|exploration|gold|infrastructure|mining|resources|surface|underground|drilling|infrastructure

Emmerson unveils plan for accelerated production at Edna May

4th December 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Mining and gold production will be accelerated at the Edna Beryl gold mine, in the Northern Territory, with ASX-listed Emmerson Resources and partner Territory Resources unveiling plans to develop and restart mining of high grade ores at the Tribute area.

Territory Resources purchased the Edna Beryl Mining Company (EBMC) as part of a larger strategic alliance with Emmerson, under which Territory also became a shareholder in Emmerson.

“The purchase of EBMC by Territory is a fantastic outcome for all concerned as it provides a quick route to the mining of high-grade gold, establishing for the first time commercial production from the Edna Beryl mine via the refurbished Warrego mill or third-party processing routes,” said Emmerson MD Rob Bills.

The Northern Territory government recently approved plans for a dewatering pipeline, which would allow for an extension and additional development of the Edna Beryl mine.

Bills said that this approval was instrumental in extending the underground development and establishing an exploration drive at Edna Beryl, providing an effective platform to drill test the multiple subparallel ironstones, some of which have yielded high-grade gold from surface drilling.

He noted that once the dewatering of the Edna Beryl workings was complete, reinstallation of the mining infrastructure would allow for the resumption of mining.

Given that the refurbishment of Territory’s Warrego Mill is scheduled for commissioning in the first half of 2019, ore mined from Edna Beryl will either be stockpile, or temporarily toll treated off site.

Under the alliance agreement, Emmerson will receive 12% of the gold dore produced.

Edited by Creamer Media Reporter

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (10/05/2024)
10th May 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.147 0.188s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: