Egoli project, South Africa

26th February 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Egoli project.

Location
The project is located in Mpumalanga, South Africa.

Project Owner/s
Pan African Resources.

Project Description
The Egoli project will be South Africa’s newest underground gold mine. The mine will capitalise on Evander Mines’ existing infrastructure, reducing the upfront capital investment.

The project is expected to contribute incremental production of about 72 000 oz/y over its minimum nine-year mine life at a head grade of 6.61 g/t of gold.

Life-of-mine (LoM) gold production is estimated at 570 000 oz.

The LoM excludes the inferred mineral resources of 6.26-million tonnes at 9.68 g/t of gold, which will be accessed once underground development is in place, and can potentially increase the LoM to 14 years.

The project initially requires about 560 m of underground development from the existing No 3 decline and will benefit from existing infrastructure such as vertical shafts, hoisting capacity and an operating metallurgical processing plant.

The existing Kinross metallurgical plant will be refurbished to process the ore.

Potential Job Creation
The project is expected to provide employment for about 1 200 people.

Net Present Value/Internal Rate of Return
The project has a net present value of R2.01-billion and an internal rate of return of 50.1% at a gold price of $1 650/oz. Project payback is estimated at 3.8 years

Capital Expenditure
Peak funding is estimated at R1.05-billion. Finalisation of the legal agreements for the implementation of the project’s debt funding package is under way.

Planned Start/End Date
The project is expected to take 20 months to complete. Ramp-up to steady-state production is expected to take 16 months thereafter.

Latest Developments
DRA Global is proceeding with project scheduling and planning as the next phase of development. Early works started in October 2020. The scope includes the defining of engineering, procurement and construction management (EPCM) documentation in preparation for the execution phase of the project.

The contract is expected to be completed in the third quarter of 2021.

Work currently in progress includes the optimisation of the ventilation and refrigeration design, dewatering designs and water balance for the project.

Requests for quotations on dimensional and nondestructive testing inspections on all winders have also been distributed to contractors.

Key Contracts, Suppliers and Consultants
DRA Global (feasibility study and EPCM).

Contact Details for Project Information
Pan African Resources, Juanita Maijsen, tel + 27 11 243 2900 or email ExecPA@paf.co.za.

Edited by Creamer Media Reporter

Comments

Showroom

Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 
The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.136 0.188s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: