https://www.miningweekly.com
Consulting|Design|Engineering|Infrastructure|Mining|PROJECT|Infrastructure
Consulting|Design|Engineering|Infrastructure|Mining|PROJECT|Infrastructure
consulting-company|design|engineering|infrastructure|mining|project|infrastructure

Denison Mines awards C$16m Phoenix contract

23rd January 2024

By: Creamer Media Reporter

     

Font size: - +

TSX- and NYSE American-listed Denison Mines has awarded a C$16-million contract to consulting and engineering group Wood Canada for the completion of detailed design engineering for the in-situ recovery mining project planned for the Phoenix uranium deposit.

Phoenix and the nearby Gryphon uranium deposit are part of the Wheeler River uranium project, which is the biggest undeveloped uranium mining project in the infrastructure-rich eastern portion of the Athabasca Basin region in northern Saskatchewan.

Denison has an effective 95% ownership interest in Wheeler River and is the project operator.

A National Instrument 43-101 feasibility study was completed by Wood in 2023 to evaluate the use of the in-situ recovery mining method at Phoenix. The results demonstrated robust base case after-tax (adjusted) economics – including a net present value (NPV) of C$1.56-billion, an internal rate of return of  90.0%, and an NPV to initial capital cost ratio in excess of 3.7 to 1.

The base case assumed uranium selling prices in the range of $$66.53 to $$70.11 per pound uranium oxide. The current spot price for uranium is about $105/lb, reflecting an increase of over 50% from the average of the base case pricing assumptions used in the Phoenix feasibility study of $68.99/lb.

Edited by Creamer Media Reporter

Comments

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.117 0.173s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: