https://www.miningweekly.com
PROJECT|Resources
PROJECT|Resources
project|resources

Crownpoint-Churchrock in situ uranium project, US

Image of uranium ore

23rd February 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Crownpoint-Churchrock in situ uranium project.

Location
New Mexico, US.

Project Owner/s
Laraminde Resources.

Project Description
A preliminary economic assessment (PEA) has confirmed the potential for a long-life, low-cost in situ recovery uranium operation.

The Crownpoint-Churchrock project has mineral resources of 33.88-million tonnes grading at 0.075% uranium for 50.82-million pounds of uranium.

The PEA proposes the development of a 31.2-million-pound operation over 31 years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The base case economic assessment shows a pre-income-tax internal rate of return of 62% and a pre-income-tax net present value of $287-million when applying an 8% discount rate and $75/lb uranium price.

Capital Expenditure
Initial capital costs are $47.5-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Laramide Resources, tel +1 416 599 7363 or email info@laramide.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

On-The-Air (17/05/2024)
On-The-Air (17/05/2024)
17th May 2024 By: Martin Creamer
Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.198 0.254s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: