https://www.miningweekly.com
Construction|Crushing|Engineering|flotation|PROJECT|Trucks|Products|Operations
Construction|Crushing|Engineering|flotation|PROJECT|Trucks|Products|Operations
construction|crushing|engineering|flotation|project|trucks|products|operations

Crawford nickel sulphide project, Canada – update

Imeg of periodic table symbol for nickel

15th September 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Crawford nickel sulphide project.

Location
Timmins, in Ontario, Canada.

Project Owner/s
Canadian developer Canada Nickel Company.

Project Description
A preliminary economic assessment (PEA) on the Crawford project has confirmed its robust economics.

The PEA has demonstrated the potential to develop a phased conventional nickel sulphide concentrator producing nickel and magnetite concentrates.

Crawford will be a conventional openpit mine/mill operation, powered by zero-carbon electricity while using trolley trucks and electric rope shovels to minimise its carbon footprint through reduced diesel consumption.

Average production is estimated at 34 000 t/y nickel, with production peaking at 42 000 t/y. Production will include significant iron and chrome by-products of 860 000 t/y and 59 000 t/y respectively.

The process plant will use a conventional milling operation comprising crushing, grinding, desliming and flotation operations consistent with other ultramafic nickel operations. The process plant will be constructed in three phases.

Phase 1 will have a steady-state throughput of 42 500 t/d using a single 36 ft x 24 ft semiautonomous grinding mill and a 26.5 ft × 44 ft ball mill grinding circuit. Phase 2 will double throughput, starting in Year 4, by mirroring the first line. Phase 3 will raise production to the ultimate rate of 120 000 t/d through the addition of secondary crushing, a third ball mill and additional downstream capacity.

About 842 000 t of nickel, 21-million tonnes of iron and 1.5-million tonnes of chrome are expected to be produced over the project’s 25-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an estimated after-tax net present value, at an 8% discount rate, of $1.2-billion and an internal rate of return of 16%.

Capital Expenditure
Phase 1 will cost about $1.19-billion, Phase 2 about $534-million and Phase 3 is estimated at $194-million.

Planned Start/End Date
Not stated.

Latest Developments
Canada Nickel has announced a $12-million bridge facility with Auramet International, allowing the company to remain well funded as it advances permitting and detailed engineering activities.

The feasibility study for Crawford will be announced later this month. A construction decision is expected by mid-2025.

Key Contracts, Suppliers and Consultants
Ausenco Engineering Canada (PEA).

Contact Details for Project Information
Canada Nickel Company, email info@canadanickel.com.

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.124 0.188s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: