Cliffs to take $1bn impairment for Thompson Iron Mines
TORONTO (miningweekly.com) – Cleveland-based Cliffs Natural Resources on Thursday said it would record a goodwill impairment of $1-billion related to the 2011 acquisition of Consolidated Thompson Iron Mines.
The goodwill impairment charge will be recorded as a noncash expense for the year ended December 31, 2012, and is mainly driven by the project's expected lower long-term volumes and higher capital and operating costs.
The delay of the Phase 2 expansion of the Bloom Lake mine, which the company acquired with the Thompson Iron Mines transaction, also contributed to the impairment.
Cliffs also said it expected to incur costs of between $100-million and $150-million for other charges related to its Eastern Canadian iron-ore business segment.
Meanwhile, Cliffs' board recently authorised the sale of the company's 30% interest in Amapa. Based on the pending terms of the sale, Cliffs expects to record a noncash pretax impairment expense of $365-million within its fourth-quarter results.
In the fourth quarter, Cliffs also expected to record $542-million in noncash valuation allowances related to two of the company's deferred tax assets, namely the mineral resource rent tax, in Australia and alternative minimum tax, in the US, carryforwards.
Lower long-term pricing assumptions and the related impact on profitability and expected future tax payments primarily drives these valuation allowances.
As a result, Cliffs would record these valuation allowances as an expense within the income tax expense line item on its statement of operations.
The company’s stock traded down 1.75% on the NYSE at $36.53 apiece on Thursday morning.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation