Chilean lithium miner SQM dealt blow by environmental court ruling
SANTIAGO – A Chilean environmental court has upheld a complaint by indigenous communities in the country´s northern Atacama Desert about the use of water by SQM, the world´s No. 2 producer of lithium.
The decision by the First Environmental Court in the nearby city of Antofagasta calls into jeopardy SQM´s $400-million plan to expand its lithium carbonate production plant to feed appetite for the ultralight battery metal.
Water has become a key sticking point for the expansion plans of both SQM and top competitor Albemarle , both of which operate in the salt flats of the Atacama, the world’s driest desert, which supply more than one-third of the global supply of lithium, a key ingredient in the batteries that power electric vehicles.
Soaring lithium demand has raised questions about whether Chile´s arid northern desert can support current and future levels of lithium production along with the needs of sprawling nearby copper mines, a booming tourism industry and indigenous communities.
The court ruled that a compliance plan presented by SQM in response to a multi-year investigation by Chile´s SMA environmental regulator that found the miner had overdrawn lithium-rich brine was "insufficient".
The plan included a new online system to monitor extraction rates of brine, which holds lithium in suspension, and the shutting down of one of its freshwater wells.
The court said its decision was based on a "precautionary principle", taking into account the "particular fragility" of the Atacama´s ecosystem and the "high level of scientific uncertainty" about the behavior of its water table. It said SQM had no way of proving that the measures it had proposed were capable of "containing and reducing or eliminating the negative effects generated by the breaches of the company."
"We must protect sensitive ecosystems even more when they constitute the ancestral habitat of our native peoples whom the State of Chile is obliged to protect," court president Mauricio Oviedo said in a statement.
The complaint was brought by indigenous people living in surrounding communities of Peine and Camar, and the Indigenous Advisory Council of Atacameno People.
The SMA must now resume its sanctioning of SQM for the original infractions, the court said, which could involve fines of over $3-million, the closure of its operations or revocation of its environmental permits.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation