Cangrejos copper/gold project, Ecuador
Name of the Project
Cangrejos copper/gold project.
Location
Ecuador.
Project Owner/s
Lumina Gold.
Project Description
The preliminary economic assessment (PEA) envisages large-scale openpit mining using a 100% owner-operated equipment fleet.
Five mining phases have been designed for Cangrejos and two mining phases have been designed for the project’s Gran Bestia deposit, both using a technique that optimises present value using a declining cutoff grade over the mine life.
Payable production is estimated at 366 000 oz/y of gold over the 25-year life-of-mine (LoM). Paybable by-product production over the LoM is estimated at 46-million pounds of copper a year.
Gran Bestia material begins to enter the mine production schedule in Year 5; however, the majority of the Gran Bestia economic mineralisation (88%) is mined in the last nine years of the production schedule.
The proposed processing plant for Cangrejos is a conventional copper/gold flotation concentrator and carbon-in-leach (CIL) circuit designed to treat 40 000 t/d of mineralised material during the first five years of operation and then be expanded to process 80 000 t/d.
Near-surface saprolite and saprock materials have been included in the mill feed, since the material can be processed with the addition of the CIL plant. The saprolite and saprock account for 2% of the LoM processed material and contain 269 000 oz of gold. The CIL circuit throughput will be 4 000 t/d in the first five years and 8 000 t/d after the expansion project in Year 6.
The dry stack tailings facility (DSTF) is proposed to be located in relatively close proximity to the plant site. This will allow for simple access by the overland conveyor from the plant to transport filtered tailings to the edge of the DSTF.
Mobile conveyors and a radial stacking system will then be used to place the tailings, along with using dozers and compactors, to spread and compact the tailings in thin lifts. As lifts are completed, it is planned that they will be progressively closed by grading the outer slopes and covering them with a growth media and revegetating them to reduce erosion and help stabilise the slopes. The facility is expected to contain about 640-million tonnes of tailings, along with having significant future expansion potential.
The waste rock storage facility (WRSF) and saprolite storage facility for the project are proposed to be located in a closed drainage basin south of the openpit and will store about 730-million tonnes of waste rock, saprolite and saprock, according to the mine production schedule. The WRSF is planned to be built in multiple phases, initially from the top down to create the WRSF haul road, and then from the bottom up. Where possible, saprolite and saprock will be stored away from the toe areas of the WRSF and at higher elevations to facilitate capping the facility with growth media. As the facility loading levels rise, lower slopes are expected to be regraded, covered with growth media and revegetated to reduce erosion and help stabilise the slopes.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a net present value, at a 5% discount rate, of $2.56-billion and an internal rate of return of 20.2%.
Capital Expenditure
Initial capital costs are estimated at $1-billion.
Capital cost to double throughput, including working capital, is estimated at $454-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
MTB Enterprises Inc (PEA) and Ausenco (DSTF).
Contact Details for Project Information
Lumina Gold, tel +1 604 646 1890 or email info@luminagold.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation