https://www.miningweekly.com

Canadian miners report strong Q1 production

11th April 2018

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Several Canadian miners have started publishing their production results for the three months ended March 31, reporting a strong start to the calendar year.

Toronto-based Kirkland Lake Gold has reported strong first-quarter results, with output growing 13% year-on-year to 147 644 oz of gold.

The performance was driven by record output in March of 71 615 oz of gold, which mainly reflected positive grade performance at both the Fosterville mine, in Australia, and Macassa, located in the Town of Kirkland Lake, Ontario.

Kirkland Lake said it remains on track to achieve its full-year production guidance of more than 620 000 oz of gold, with production volumes to increase in the second half of the year, including at Fosterville, where stope production from the high-grade Swan zone is expected to start.

Fellow Toronto-based miner Roxgold has also released first-quarter production results, reporting 40 452 oz of gold output from the company's Yaramoko mine, in Burkina Faso. Production was ahead of schedule and mill throughput came to 71 576 t – 8% above the operation’s nameplate capacity.

The record gold production for the quarter was driven by improved operating performance in both the mine and processing plant. Construction works at Bagassi South continue on schedule, remaining on track to deliver first ore during the fourth quarter, the company stated. The high-grade underground operation is expected to add about 40 000 oz/y of gold to the company’s production profile.

Meanwhile, Vancouver-based base metals producer Capstone Mining on Tuesday said it had a slower-than-planned start to the year, with copper production down 5% year-on-year, but still in line with full-year guidance of 90 000 t. Consolidated output is expected to ramp up during subsequent quarters.

Capstone advised that, at Pinto Valley, in Arizona, production was lower than planned with throughput and recoveries at the low end of expectations. The grade was in line with the mine plan for the quarter, with higher head grades and production expected over the remainder of the year.

At Cozamin, in Mexico, production for the quarter was better than expected on account of higher grades. At the Minto mine, in Canada's Yukon Territory, production was lower than planned with mining delays in the underground operations and lower than expected grades coming from the Area 2 Stage 4 pushback, resulting in lower-grade mill feed during the quarter, the company said.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.122 0.161s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: