https://www.miningweekly.com
Construction|Consulting|Copper|Flow|Gold|PROJECT|Projects|Resources|srk|SRK Consulting|Water|Flow|Environmental
Construction|Consulting|Copper|Flow|Gold|PROJECT|Projects|Resources|srk|SRK Consulting|Water|Flow|Environmental
construction|consulting-company|copper|flow-company|gold|project|projects|resources|srk|srk-consulting|water|flow-industry-term|environmental

Canadian junior to fast-track San Juan copper/gold project

21st November 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

The Josemaria copper/gold project in the Andes mountains of San Juan, Argentina, will be on an accelerated development schedule, as Canadian junior NGEx Resources moves to elevate the project to construction-ready level amid a global scarcity of such projects.

With the long-term copper fundamentals strong and the global project pipeline at multi-decade lows, NGEx believes that construction-ready projects will attract premium valuations, CEO Wojtek Wodzicki said on Tuesday, announcing the outcomes of a prefeasibility study for Josemaria.

The study, prepared by SRK Consulting (Canada) with input from others, delivered robust economics and confirmed the potential of Josemaria, calculating an after-tax net present value, using an 8% discount rate, of $2-billion and an internal rate of return of 18.6%, at $3/lb copper.

Over a 20-year life, the mine will produce more than 5.4-billion pounds of copper and 4.6-million ounces of gold, with output averaging about 125 000 t/y of copper, 230 000 oz/y of gold and 790 000 oz/y of silver, at a C1 cash cost of $1.26/lb copper-equivalent.

In the first three years of full production, the mine will deliver 170 000 t/y of copper, 350 000 oz/y of gold and one-million ounces a year of silver.

The strong front-end production and cash flow will drive a 3.4-year payback period and will support a variety of financing alternatives for the project, which is estimated to require $2.75-billion in initial capital expenditure.

Wodzicki said that NGEx would fast-track Josemaria towards production by starting work on a feasibility study, securing water rights and advancing the environmental permitting plans.

Edited by Creamer Media Reporter

Comments

Showroom

Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.071 0.113s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: