https://www.miningweekly.com

Caledonia reports record yearly gold output at Zim operations

14th January 2013

By: Natasha Odendaal

Creamer Media Senior Deputy Editor

  

Font size: - +

JOHANNESBURG (miningweekly.com) – TSX- and Aim-listed gold producer Caledonia Mining on Monday reported that, despite an expected fall in its fourth-quarter gold production, its Zimbabwe-based Blanket mine achieved record output for the 2012 full-year.

The mine, which achieved its highest quarterly production in its 106-year history during the third quarter, produced in excess of 45 600 oz during 2012 – a 27% increase compared with the 35 826 oz produced in 2011.

Caledonia also exceeded its 10 000 oz quarterly target during the fourth quarter of the year, reaching 11 980 oz – 7% lower than the third quarter’s output of 12 919 oz, but 14% higher than the 10 533 oz produced in the corresponding quarter in 2011.

“As anticipated and as previously advised, gold production in the fourth quarter was lower than in the third quarter as the achieved grade returned to ... an average of 3.84 g/t,” commented Caledonia president and CEO Stefan Hayden.

The gold miner aimed to increase output at the Blanket operation to 76 000 oz/y of gold by 2016, up from the current 40 000 oz targeted for 2013.

The group’s fourth-quarter and 2012 financial year-end results were expected to be published on March 31.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.132 0.169s - 106pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: