https://www.miningweekly.com
Africa|Coal|Construction|Contractor|Design|Energy|Engineering|EPCM|Financial|Freight|Industrial|Mining|Power|PROJECT|rail|Resources|Road|Services|Surface|Transnet|Waste|Water|Maintenance|Environmental|Infrastructure|Waste
Africa|Coal|Construction|Contractor|Design|Energy|Engineering|EPCM|Financial|Freight|Industrial|Mining|Power|PROJECT|rail|Resources|Road|Services|Surface|Transnet|Waste|Water|Maintenance|Environmental|Infrastructure|Waste
africa|coal|construction|contractor|design|energy|engineering|epcm|financial|freight|industrial|mining|power|project|rail|resources|road|services|surface|transnet|waste-company|water|maintenance|environmental|infrastructure|waste

Boikarabelo coal project, South Africa

6th November 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Boikarabelo coal project.

Location
Waterberg region in Limpopo, South Africa.

Project Owner/s
Ledjadja Coal Limited (LCL), a subsidiary of Resource Generation (Resgen).

Project Description
The Boikarabelo coal reserves were estimated at 267.1-million tonnes as at June 30, 2018.

The Boikarabelo coal seam is between 20 m and 30 m below the surface, allowing for low-cost, opencut mining. The seam is between 100 m and 120 m thick, with zones of varying-quality thermal and soft coking coal.

In February 2016, Resgen implemented a revised mine plan. This followed a technical review of the geological model by its technical committee comprising in-house and external experts, who suggested that the revised plan could achieve more than previously expected. The plan is based on selective mining and in-pit dumping to maximise productivity, reduce operating costs and minimise any environmental impact.

The company also implemented a project execution strategy, which transfers mine construction risk, through the appointment of a small number of reputable engineering, procurement and construction contractors with substantial balance sheets, which will allow for recourse in the event of failure or delay.

The mine will be developed using a two-phased approach to limit upfront capital expenditure.

Stage 1 will deliver about 15-million tonnes of run-of-mine coal a year, which will equate to about six-million tonnes of product coal. Of this, about 3.6-million tonnes will be exported and about 2.4-million tonnes will be used domestically.

Stage 2 will involve ramping up production to 12-million tonnes of product thermal coal. It is estimated that fully funded Phase 2 construction and production will not begin before 2025.

The project includes a 44 km rail link to the existing rail network.

To expand the Boikarabelo project’s economic base, a bankable feasibility study on a potential 300 MW independent mine-mouth power station will be completed once the Boikarabelo mine has been commissioned.
 
Potential Job Creation
The project is expected to create 2 500 jobs in the construction phase and 709 full-time jobs.

Net Present Value/Internal Rate of Return
The project has an internal rate of return of 17%.

Capital Expenditure
The estimated capital cost for the project is $300-million.

Planned Start/End Date
LCL received the Boikarabelo mining rights from what was then known as Department of Mineral Resources in April 2011. Initial construction of the mine started in the first quarter of 2013 and was scheduled for completion in September 2018. However, the mine’s expected date of first coal production has been delayed and the first deliveries of coal are now scheduled for the second half of 2022.

Latest Developments
Owing to delays in satisfying certain conditions precedent to reaching financial close for first drawdown under the mine funding package for the construction of the Boikarabelo coal project, Resgen has been trying to secure formal sign-off on the extension of the common terms agreement.

On December 5, 2019, Resgen announced that, along with its majority-owned subsidiary Ledjadja Coal, it had executed principal binding agreements for the funding of the construction of Boikarabelo.

The members of the lending syndicate comprised the Government Employees Pension Fund and the Unemployment Insurance Fund, the Industrial Development Corporation (IDC) of South Africa and Noble Resources International.

While seeking these formal sign-offs, the company has now been advised by the IDC that, after completing a due diligence investigation for the purpose of the extension, it has been concluded that the market conditions under which Boikarabelo would operate have deteriorated materially.

Based on the findings, the IDC’s Special Credit Committee resolved that IDC should not grant an extension of the common terms agreement, Resgen has noted.

The IDC Special Credit Committee also decided to cancel all previously approved facilities under the mine funding package.

Resgen is seeking an urgent meeting with Noble to discuss this development.

Key Contracts, Suppliers and Consultants
Digby Wells Environmental (mining right application, mine-waste licence, environmental authorisation process for power plant); Sedgman (design, engineering, procurement and construction contract for the coal handling preparation plant, the ongoing operation and maintenance of the plant, and construction of the ancillary works pertaining to the infrastructure of the mine); RCE (rail design and construction, engineering, procurement and construction management, or EPCM, services); NuWater (water EPCM services); EHL Energy (transmission lines), Stefanutti Stocks (preferred mining contractor), Stefanutti Stocks Road and Earthworks (rail earthworks and bridges) and Transnet Freight Rail (ballast, track and signalling).

Contact Details for Project Information
Resgen, tel +27 11 010 6310, fax +27 86 539 3792 or email info@resgen.com.au.

Edited by Creamer Media Reporter

Comments

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.197 0.252s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: