https://www.miningweekly.com
Construction|Gold|Mining|PROJECT|Storage|Underground|Water|Environmental
Construction|Gold|Mining|PROJECT|Storage|Underground|Water|Environmental
construction|gold|mining|project|storage|underground|water|environmental

Bellevue gold project ticks final permitting box

5th June 2023

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Western Australian mining company Bellevue Gold on Monday announced that it had received the tailings facility and water storage permits for its namesake gold project.

The approvals, which were granted under the Environmental Protection Act 1986 (WA), are the final material permits required for commissioning and full operation of the Bellevue project.

Construction and underground development are running on time and on budget, with first gold set for the December quarter.

During the first 12 months of commercial production, the project is forecast to produce between 180 000 oz and 200 000 oz at an all-in sustaining cost of A$1 000/oz to A$1 100/oz. 

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.173 0.217s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: