https://www.miningweekly.com
Marine|Mining|PROJECT|Screening|Maintenance|Operations
Marine|Mining|PROJECT|Screening|Maintenance|Operations
marine|mining|project|screening|maintenance|operations

Bauxite miner Metro meets guidance despite weather setbacks

8th January 2024

By: Creamer Media Reporter

     

Font size: - +

Bauxite miner Metro Mining has met its market guidance for 2023 with 4.57-million wet metric tonnes (WMT) of high-grade bauxite mined and shipped to customers in the year, despite weather-related setbacks.

Tropical cyclone Jasper halted transhipping operations for ten days in December, while subsequent heavy rain and flooding affected the site.

Metro reported that the adverse weather conditions prevented the floating crane from resuming operations, however, geared loading continued until January 4 for a total of 4.61-million WMT shipped from April 2023.

The Metro Bauxite Hills operation has now entered its yearly shutdown period, during which critical maintenance on fixed, mobile and marine assets will be conducted and a new wobbler screening circuit will be installed as part of the seven-million-tonne-a-year expansion project.

Operations will resume in March.

Edited by Creamer Media Reporter

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.18 0.219s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: