https://www.miningweekly.com
Design|Excavator|Mining|PROJECT|Resources|Storage|Surface|Water|Drilling|Infrastructure
Design|Excavator|Mining|PROJECT|Resources|Storage|Surface|Water|Drilling|Infrastructure
design|excavator|mining|project|resources|storage|surface|water|drilling|infrastructure

Balama Central graphite project, Mozambique

22nd February 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Balama Central graphite project.

Location
The project is located in the province of Cabo Delgado, in northern Mozambique.

Client
Battery Minerals.

Project Description
A feasibility study has found that Balama Central will generate outstanding returns.

The project has a maiden reserve of 19.66-million tonnes grading 11.06% total graphitic carbon (TGC) for 2.2-million tonnes of contained graphite and total mineral resources of 32.9-million tonnes grading 10.2% TGC. Mining will be undertaken using standard truck-and-excavator methods. Drill-and-blast of the fresh material will be required.

The process plant will process run-of-mine ore at an average rate of 480 000 t/y at more than 12.5% TGC to produce 58 000 t/y of dry graphite concentrate, with a grade of +96% TGC, over a 27 year mine life.

The processed tailings will be deposited in a tailings storage facility (TSF) with a basin footprint of 180 ha.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax internal rate of return of 55%, with a payback 2.3 years.

Value
Capital expenditure (capex) is estimated at $69.43-million.

Duration
Not stated.

Latest Developments
Battery Minerals expects to develop Balama Central after its first Mozambique graphite project, Montepuez, is commissioned.

Key Contracts and Suppliers
Mitchell Drilling Contractors Mozambique (resource drilling); RPM Global (feasibility study resource estimation); Snowden (resource to reserve estimation and life-of-mine design and scheduling, mine geotechnical study, mine layout and design, and mine design); WRP Consultants (surface hydrology study); LADP (graphite product metallurgical assessment, nonprocess plant infrastructure, process plant design and plant capex and operating expenditure estimates); Epoch (design and assessment of the TSF and water storage facility).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Battery Minerals, tel +258 214 937 35 or email info@batteryminerals.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.203 0.258s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: